• NOTIFICATION TO UNIVERSITY OF CONNECTICUT

    For Mansfield Projects within designated Aquifer Protection Areas
  • Section 8-3i of the State Statutes requires applicants to provide to all water companies written notice of an application, petition, request or plan if the proposed project is located within a designated aquifer protection area. The applicant must mail such notice within seven (7) days of the date of the application, by certified mail, return receipt requested. To meet this requirement, this form shall be used by applicants in Mansfield for projects within designated Aquifer Protection Areas in Mansfield. To determine if a project is within the aquifer protection area, please consult the Zoning Map. Failure of an applicant to comply with this statutory requirement may be grounds for a claim of procedural error ad a successful legal challenge of the decision rendered on the application.

     

  • Project Street Location/Nearest Utility Pole__________________________

    Contact Person________________________________________________

    Telephone number_____________________________________________

    Brief description of application (For example: 10 lot subdivision of single family homes with on-site septic systems and wells)

     

  • Public Hearing Date:_____________ Commission/Agency Meeting Date(s)_________

     

     

     

  • Enclose a copy of the application submitted to the Town and a full set of project plans. Mail this completed form by certified mail, return receipt requested, to:

    University of Connecticut, Facilities Operations and Building Services

    Director of Utility Operations and Energy Management

    25 LeDoyt Road, Unite 3252

    Storrs, CT 06269-3252

  • Should be Empty: